Name the closeboard construction
Closeboard commonly uses overlapping vertical feather-edge boards with rails and posts. Product and supplier terms can differ, so ask for the actual construction and finish. That makes quotations describe comparable work.
Compare panels and site-built work
Compare panel units with suitable site-built work around the run’s levels and access. Neither form automatically suits every site better. Ask how connections, supports and changes in level will be handled.
Set screening and support requirements
Describe screening, intended height and surrounding openings. A solid run needs supports suited to actual exposure and use. Ask what site assessment supports the proposal rather than assume a style name guarantees wind performance.
Include rails, posts and lower edges
Include rails, posts, fixings and lower-edge details, with retained components checked. Suitable separation and levels depend on the chosen system. Ask how the run joins walls, gates or different fencing.
Repair boards with supports considered
For repairs, distinguish damaged boards from rail, support or base failure. Agree what remains and whether matching components are available. New facing should not simply conceal an unresolved support problem.
Agree boundary and associated-work authority
Confirm boundary authority, relevant frontage permission and side access. If work includes trees or hedges, wildlife and protection can be separate checks. A closeboard quotation does not authorise every associated removal.
Compare complete quantities and finish
Compare quantities, construction, finished dimensions, supports, removal and disposal. Keep material and care information. Planned installation or a local closeboard repair can be quoted to a defined scope.
Questions about the construction
- Is the run panel-based or assembled on site?
- What supports and lower-edge details are included?
- Which retained parts and removal tasks are covered?
Closeboard questions
Are all closeboard quotations the same construction?
No. Ask for the product or site-built method, rails, posts and finish.
Can I request repair to individual boards?
Yes. Describe the damage and ask whether supports or rails also need work.