Assess the supported fence and gates
Describe what the post carries and how adjacent sections are affected. A gate’s loads can differ from ordinary infill. Ask for the retained run and connections to be assessed with the proposed support.
Compare repair with replacement
Compare repair, reinforcement and replacement after the actual condition and base are checked. Straightening a leaning post may not address its cause. Ask why the proposed approach suits what remains.
Specify suitable material and connections
Compare suitable timber, concrete or metal as specified systems with relevant fixings and care. Material alone does not establish the complete run’s durability. Ask for the actual product and connection details.
Plan safe base removal and excavation
Old bases, roots, structures and buried services can affect excavation. Give known information and ask for safe locating and work arrangements. Do not dig around an uncertain pipe or cable to prepare an enquiry.
Include complete gate operation
Include the gate’s leaf, hinges, latch and opening arrangement when assessing a supporting post. A gate problem may need more than a fence-support change. Ask what complete operation will be restored.
Agree line and working authority
Agree the boundary, working authority and side access. A replacement post does not authorise moving the line or changing a protected Ipswich frontage. Include treatment of adjacent surfaces and planting.
Compare reconnection and finished ground
Compare old-base removal, new support, connected fence work, disposal and reinstatement. Ask how discoveries are authorised. Keep the finished specification and care information after the repair.
Questions about supports and bases
- What fence and gate loads are supported?
- How are old bases and services handled?
- Are reconnection and reinstatement included?
Fence-post questions
Can I enquire about one failed post?
Yes. Describe its connected run, gate if any and access so the suitable repair can be assessed.
Does a concrete post guarantee the whole fence?
No. Bases, connections and retained components need to form a suitable complete system.